RC Substation - Hillingdon

  • Drainage diversion of foul and storm water
  • Reduce dig and sub-base
  • Pile cropping
  • RC formwork and steel reinforcement fixing for concrete bases, walls and plinths including large blast wall cavities
  • Gas membrane installation and certification
  • GRP decking
  • Computer access flooring
  • External finishes including Section 278 bell mouth entrance, block paving and tarmacking with white lining